|
|
|
Download |
|
I. STANDARD PLAT FORMAT |
|
PDF – DOC |
|
|
|
|
|
Standard Dedication Statement |
P-1 |
|
|
Dedication Formats |
P-3 |
|
|
Mortgagee's Consent |
P-5 |
|
|
Acknowledgments |
P-6 |
|
|
Standard (Approval) Signature Block |
P-7 |
|
|
Title Certification |
P-8 |
|
|
Surveyor's Certificate |
P-9 |
|
|
Preparing Surveyor's Statement/Reviewing Surveyor's Statement |
P-10 |
|
|
Surveyor's Notes |
P-11 |
|
|
|
|
|
|
II. FINANCIAL GUARANTEES |
|
|
|
|
|
|
|
Financial Guarantees as required by Land Development Regulations |
FG-1 |
|
|
Financial Guarantee and Agreement for Completion of Required Improvements (Performance Bond) |
FG-3 |
|
|
Instructions for Performance Bond Submittal |
FG-6 |
|
|
Financial Guarantee and Agreement for Completion of Required Improvements (Letter of Credit) |
FG-7 |
|
|
Irrevocable Letter of Credit Format |
FG-10 |
|
|
Financial Guarantee and Agreement for Completion of Required Improvements (Cash Account) |
FG-11 |
|
|
Environmental Services Department Inspections Fee Schedule |
FG-14 |
|
|
|
|
|
|
III. PROJECT CONSTRUCTION |
|
|
|
|
|
|
|
Preconstruction Meetings |
C-1 |
|
|
Storm Water Pollution Prevention Plan (PPP) |
C-2 |
|
|
Storm Water PPP Inspection & Maintenance Report Form |
C-5 |
|
|
Shop Drawing Submittal |
C-6 |
|
|
Maintenance of Traffic Plan |
|
|
|
Building Permits |
|
|
|
Construction Inspections |
|
|
|
Engineering Project Close Out Check List |
C-7 |
|
|
As-built Drawing Requirements |
C-8 |
|
|
Engineer's Certificate of Completion |
C-10 |
|
|
Minimum Standards for Sanitary Sewer Plan Review |
C-11 |
|
|
Minimum Standards for Water Distribution Plan Review |
C-13 |
|
|
|
|
|
|
IV. GENERAL NOTES |
GN-1 |
|
|
|
|
|
|
V. STANDARDS PRODUCTS LIST |
SPL-1 |
|
|
|
|
|
|
VI. STANDARD DETAILS |
|
|
|
|
|
|
|
ROADWAY AND TRAFFIC DETAILS |
|
PDF – DXF - DWG |
|
|
|
|
|
Typical 50' R/W Section with Valley Gutter |
RT 1.1a |
|
|
Typical 50' R/W Section with Swale |
RT 1.1b |
|
|
Typical 60’ R/W Section |
RT 1.2 |
|
|
Typical 50’ R/W Section with Parallel Parking Section |
RT 1.3 |
|
|
Typical 60’ R/W Section with Paralell Parking Section |
RT 1.4 |
|
|
Street Sign Detail |
RT 2.1a |
|
|
Street Sign Detail |
RT 2.1b |
|
|
Intersection Detail |
RT 3.1 |
|
|
Intersection Traffic Control Stop Condition |
RT 3.2 |
|
|
Crosswalk Details |
RT 3.3 |
|
|
Typical Roundabout Detail (Sheet 1 of 2) |
RT 3.4a |
|
|
Typical Roundabout Detail (Sheet 2 of 2) |
RT 3.4b |
|
|
Speed Hump/Table |
RT 3.5a |
|
|
Speed Hump Pavement Markings |
RT 3.5b |
|
|
Parking Lots |
RT 4.1 |
|
|
Typical Parking Spaces |
RT 4.2 |
|
|
Typical On Street Handicapped Parking Spaces |
RT 4.2a |
|
|
Sidewalk Construction |
RT 5.1 |
|
|
Curb and Gutter Sections |
RT 6.1 |
|
|
Pavement Joint Section |
RT 7.1 |
|
|
Pavement Marking Specifications (Sheet 1) |
RT 8.1a |
|
|
Pavement Marking Specifications (Sheet 2) |
RT 8.1b |
|
|
Concrete Driveway Apron |
RT 9.1 |
|
|
Asphalt Driveway Apron |
RT 9.2 |
|
|
Minimum Layout Standards for Duplex Parking |
RT 9.3 |
|
|
Paver Brick Section |
RT 10.1 |
|
|
Paver Brick Driveway Apron |
RT 10.2 |
|
|
Detectable Warning Ramp |
RT 10.3 |
|
|
Paver Brick Sidewalk Driveway Apron Detail |
RT 10.4 |
|
|
Typical Light Pole |
RT 11.1 |
|
|
|
|
|
|
STORM WATER DRAINGE DETAILS |
|
PDF – DXF – DWG |
|
|
|
|
|
Storm Sewer Manhole Frame and Cover |
D 1.1 |
|
|
Storm Sewer Manhole |
D 2.1a |
|
|
Shallow Manhole |
D 2.1b |
|
|
Standard Bedding Detail |
D 3.1 |
|
|
Type C & E Inlet Valley Gutter Frame & Grate |
D 4.1 |
|
|
Type C & E Inlet Type “F” Curb Frame & Grate |
D 4.2 |
|
|
Inlet Apron Detail |
D 5.1 |
|
|
Type C & E Inlet Grate Detail |
D 6.1 |
|
|
Type C & E Inlet Detail |
D 7.1 |
|
|
Inlet Filter Detail |
D 8.1 |
|
|
Erosion Control Notes |
D 9.1 |
|
|
Silt Fence Installation Detail (Sheet 1 of 2) |
D 9.1a |
|
|
Silt Fence Installation Detail (Sheet 2 of 2) |
D 9.1b |
|
|
Stabilized Construction Entrance |
D 9.1c |
|
|
Swale Replacement Detail |
D 10.1 |
|
|
Mail Box Replacement and 6” Sodded Swale Detail |
D 10.2 |
|
|
|
|
|
|
GENERAL UTILITY CONSTRUCTION DETAILS |
|
PDF – DXF - DWG |
|
|
|
|
|
Pavement Repair Detail |
GU 1.1 |
|
|
Typical Backfill Detail |
GU 2.1 |
|
|
Jack and Bore |
GU 3.1 |
|
|
Carrier Pipe Supports |
GU 3.2 |
|
|
|
|
|
|
|
|
|
|
POTABLE WATER DISTRIBUTION DETAILS |
|
PDF – DXF - DWG |
|
|
|
|
|
Fill and Flush Detail |
PW 1.1 |
|
|
Water Main & Sewer Conflict |
PW 2.1 |
|
|
Typical Gate Valve Detail 4" thru 12" |
PW 3.1 |
|
|
Cast Iron Valve Boxes, Two Piece |
PW 3.2 |
|
|
Typical Butterfly Valve Setting |
PW 4.1 |
|
|
Typical Fire Hydrant Installation |
PW 5.1 |
|
|
Bollard Detail |
PW 5.2 |
|
|
Typical 2" Terminal Blow-Off for Temporary Dead Ends |
PW 6.1a |
|
|
Typical 2” Terminal Blow-Off for Permanent Dead Ends |
PW 6.1b |
|
|
Typical Sample Point |
PW 7.1 |
|
|
Underground Air Release Valve and Vault |
PW 8.1 |
|
|
Typical Service Connection |
PW 9.1a |
|
|
Typical Urban/Redevelopment Area Service Connection in Driveways or Sidewalks |
PW 9.1b |
|
|
Typical Fire Service Connection |
PW 9.1c |
|
|
Typical Double Service Connection |
PW 9.2 |
|
|
Double Detector Check Valve |
PW 10.1 |
|
|
Reduced Pressure Zone Backflow Preventer |
PW 10.2 |
|
|
Anti-Siphon Pressure Type Vacuum Breaker |
PW 10.3 |
|
|
Monitor Wellhead Construction Detail |
PW 11.1 |
|
|
Monitor Well Construction Diagram |
PW 11.2 |
|
|
|
|
|
|
WASTEWATER COLLECTION/TRANSMISSION DETAILS |
|
PDF – DXF - DWG |
|
|
|
|
|
Gravity Sewer Notes |
WW 1.1 |
|
|
Standard Manhole Detail |
WW 2.1 |
|
|
Shallow Manhole Detail |
WW 2.2 |
|
|
Drop Manhole Detail |
WW 2.3 |
|
|
Invert Flow Channels |
WW 2.4 |
|
|
Sanitary Sewer Manhole Frame and Cover |
WW 2.5 |
|
|
Force Main Entering Manhole |
WW 3.1 |
|
|
Sewer Service Connection |
WW 4.1 |
|
|
Typical Residentail Cleanout |
WW 5.1 |
|
|
Typical Commercial Cleanout |
WW 5.2 |
|
|
Standard Bedding Detail |
WW 6.1 |
|
|
|
|
|
|
WATER/WASTEWATER PRESSURE PIPE DETAILS |
|
PDF – DXF - DWG |
|
|
|
|
|
Pressure Pipe Notes |
PP 1.1 |
|
|
Pipe Restraint Table for Pressure Pipe (Sheet 1 of 2) |
PP 2.1a |
|
|
Pipe Restraint Table for Pressure Pipe (Shhet 2 of 2) |
PP 2.1b |
|
|
Pressure Pipe Conflict Detail |
PP 3.1 |
|
|
Typical Utilities Canal Crossing |
PP 4.1 |
|
|
Fan Guard |
PP 4.2 |
|
|
Pig Launcher |
PP 5.1 |
|
|
Pressure Relief, Pressure Sustaining or Back Pressure Valve |
PP 6.1 |
|
|
Pressure Relief/Sustaining Valve Specs |
PP 6.2 |
|
|
|
|
|
|
LANDSCAPING AND ROOT BARRIER DETAIL |
|
PDF – DXF - DWG |
|
|
|
|
|
Typical Tree With Root Barrier |
LD 1.1 |
|
|
Typical Tree Without Root Barrier |
LD 1.2 |
|
|
|
|
|
|
SEWAGE LIFT STATION DETAILS |
|
PDF – DXF - DWG |
|
|
|
|
|
General Lift Station Requirements (Sheet 1) |
LS 1.1a |
|
|
General Lift Station Requirements (Sheet 2) |
LS 1.1b |
|
|
General Lift Station Requirements (Sheet 3) |
LS 1.1c |
|
|
Installation Notes |
LS 1.2 |
|
|
Typical Site Plan Layout |
LS 2.1 |
|
|
Typical Lift Station Plan |
LS 2.2 |
|
|
Typical Lift Station (Section) |
LS 2.3 |
|
|
Typical Control Panel |
LS 3.1 |
|
|
General Lift Station Panel Requirements (Sheet 1) |
LS 3.2a |
|
|
General Lift Station Panel Requirements (Sheet 2) |
LS 3.2b |
|
|
Power Line Diagram |
LS 3.3 |
|
|
Electrical Notes (Sheet 1) |
LS 3.5a |
|
|
Electrical Notes (Sheet 2) |
LS 3.5b |
|
|
Remote Terminal Unit (RTU) Specifications(Sheet 1) |
LS 4.1a |
|
|
Remote Terminal Unit (RTU) Specifications(Sheet 2) |
LS 4.1b |
|
|
Remote Terminal Unit (RTU) Specifications(Sheet 3) |
LS 4.1c |
|
|
Remote Terminal Unit (RTU) Specifications(Sheet 4) |
LS 4.1d |
|
|
Remote Terminal Unit (RTU) Specifications(Sheet 5) |
LS 4.1e |
|
|
Remote Terminal Unit (RTU) Telemetry Requirements |
LS 4.2 |
|
|
Panel Requirements Diagram (Sheet 1 of 5) |
LS 4.3a |
|
|
Panel Requirements Diagram (Sheet 2 of 5) |
LS 4.3b |
|
|
Panel Requirements Diagram (Sheet 3 of 5) |
LS 4.3c |
|
|
Panel Requirements Diagram (Sheet 4 of 5) |
LS 4.3d |
|
|
Panel Requirements Diagram (Sheet 5 of 5) |
LS 4.3e |
|
|
|
|
|
|
INDUSTRIAL PRETREATMENT PROGRAM |
|
PDF – DXF - DWG |
|
|
|
|
|
Inspection/Monitoring Requirements (Option 1) |
IPP 1.1 |
|
|
Inspection/Monitoring Requirements (Option 2) |
IPP 1.2 |
|
|
Sand/Grit Interceptor For Car Wash |
IPP 2.1 |
|
|
Oil/Water Interceptor For Car Wash |
IPP 2.2 |
|
|
Oil/Water Interceptor Sizing Guidelines |
IPP 3.1 |
|
|
Sand Interceptor |
IPP 4.1 |
|
|
Oil/Grease Interceptor |
IPP 5.1 |
|
|
Grease Trap Guidelines |
IPP 6.1 |
|
|
Indoor Grease Trap |
IPP 7.1 |
|
|
Hair/Lint Interceptor |
IPP 8.1 |
|
|
Various Approved Lint Interceptor Designs for Commercial Laundries |
IPP 8.2 |
|
|
Inspection/Monitoring Manhole |
IPP 9.1 |
|
|
Secondary Containment Structure |
IPP 10.1 |
|
|
Overpack Drum/Secondary Containment Structure |
IPP 11.1 |
|
|
|
|
|
|
RECLAIMED WATER DESIGN AND CONSTRUCTION DETAILS |
|
PDF – DXF - DWG |
|
|
|
|
|
Reclaimed Water Design Standards |
RWDS |
|
|
Typical Reclaimed Water Service Connection ¾" through 2" (Sheet 1) |
RW 1.1a |
|
|
Typical Reclaimed Water Service Connection ¾" through 2" (Sheet 2) |
RW 1.1b |
|
|
Typical Reclaimed Water Double Service Connection ¾" through 2" |
RW 2.1 |
|
|
3" Meter Service Detail (Sheet 1) |
RW 4.1a |
|
|
3" Meter Service Detail (Sheet 2) |
RW 4.1b |
|
|
4" Meter Service Detail (Sheet 1) |
RW 5.1a |
|
|
4" Meter Service Detail (Sheet 2) |
RW 5.1b |
|
|
6" Meter Service Detail (Sheet 1) |
RW 6.1a |
|
|
6" Meter Service Detail (Sheet 2) |
RW 6.1b |
|
|
Typical Gate Valve Setting and Main Cut-in Detail |
RW 8.1 |
|
|
Typical Butterfly Valve Setting |
RW 9.1 |
|
|
Reclaimed Water Pipe Separation (Sheet 1 of 2) |
RW 10.1a |
|
|
Reclaimed Water Pipe Separation (Sheet 2 of 2) |
RW 10.1b |
|
|
Pressure Pipe Conflict (Sheet 1 of 2) |
RW 11.1a |
|
|
Pressure Pipe Conflict (Sheet 2 of 2) |
RW 11.1b |
|
|
Casing Installation Details |
RW 12.1 |
|
|
Typical Trench Detail/Root Barrier Installation Detail |
RW 13.1 |
|
|
Typical Utilities Canal Crossing (Sheet 1 of 2) |
RW 14.1a |
|
|
Typical Utilities Canal Crossing (Sheet 2 of 2) |
RW 14.1b |
|
|
Fan Guard/Pile Cap Design |
RW 15.1 |
|
|
Underground Air Release Valve & Vault in Non-traffic Areas Outside of Right-of-Way |
RW 16.1 |
|
|
Air Release Manhole in Paved Area and in Road Right-of-Way |
RW 17.1 |
|
|
Pressure Test Criteria |
RW 18.1 |
|
|
Off-set Underground Air Release Valve |
RW 19.1 |
|
|
Pipe Installation Under Existing Pavement – Open Cut |
RW 20.1 |
|
|
Reclaimed Water Standard Sign |
RW 21.1 |
|